What can be the probable causes for a gross mismatch between ship and shore oil figures? A. Ullages incorrectly measured, Tanks filled but not taken into account, The contents of pipelines not allowed for, Cargo mistakenly loaded on top of ballast and Cargo lost in the shore installation. B. Incorrectly measured Ullages/ Temperatures/ densities, Tanks filled but not taken into account, The contents of pipelines not allowed for, Incorrect temperatures or densities, Cargo mistakenly loaded on top of ballast and Cargo lost in the shore installation. C. Ullages incorrectly measured, Tanks filled but not taken into account, The contents of pipelines not allowed for, Incorrect temperatures or densities, and Cargo lost in the shore installation. D. Ullages incorrectly measured, The contents of pipelines not allowed for, Incorrect temperatures or densities, Cargo mistakenly loaded on top of ballast and Cargo lost in the shore installation. « Previous Next » Comments