Water tightness and structural integrity of dry peaks are tested by A. Hose test B. By filling them with water up to water line C. Fill water up to load water line d. fill water up to 2.44mts above tank crown or max head which can come on them, whichever is higher D. None « Previous Next » Comments
Comments
Post a Comment